In 2026, employers still look for credentials they can verify quickly, and CTAL_TM_001 remains one of them. TestsDumps gives that goal a realistic path: 232 verified practice questions, marked-error feedback, and updates that follow the exam as it evolves.
ISTQB CTAL_TM_001 Exam Overview:
| Certification Vendor: | ISTQB |
|---|---|
| Exam Name: | ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM-001) |
| Exam Number: | CTAL-TM-001 |
| Exam Format: | Scenario-based questions, Point-weighted scoring, Multiple choice |
| Available Languages: | English, French, Japanese, German, Spanish, Chinese, Portuguese, Russian |
| Exam Price: | USD 200 - USD 300 (varies by country/board) |
| Passing Score: | 58 out of 88 points (approx. 66%) |
| Real Exam Qty: | 50 |
| Exam Duration: | 120 (150 for non-native language) |
| Certificate Validity Period: | Lifetime |
| Related Certifications: | ISTQB Certified Tester Foundation Level ISTQB Certified Tester Expert Level |
| Recommended Training: | Official Syllabus and Sample Exams ISTQB Accredited Training Providers |
| Exam Registration: | iSQI Registration BCS Registration ISTQB Official Registration |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or onsite at accredited test centers |
| Pre Condition: | Hold ISTQB Certified Tester Foundation Level certificate; recommended 18–36 months of practical testing experience |
| Official Syllabus URL: | https://istqb.org/certifications/certified-tester-advanced-level-test-management-ctal-tm-v3-0/ |
ISTQB CTAL_TM_001 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Managing the Test Activities | 40% | - Test monitoring and control
|
| Topic 2: Managing the Product | 30% | - Lifecycle and context adaptation
|
| Topic 3: Managing the Team and People | 30% | - Leadership and communication
|
What Candidates Ask About ISTQB Certified Tester Advanced Level - Test Manager
The ISTQB Certified Tester Advanced Level - Test Manager content is the same across all three formats: a printable PDF, a software engine, and an online engine. The free demo lets you try each interface before buying, so you can pick the one that matches how you study rather than guessing.
The package contains 232 practice questions for the CTAL_TM_001 exam, all verified by our IT experts. A free demo is available so you can review the style before you buy.
- Managing the Test Activities (40%)
- Managing the Product (30%)
- Managing the Team and People (30%)
Use the weights above to divide your study time where it matters most.
The engine presents ISTQB Certified Tester Advanced Level - Test Manager questions in random order, so each session feels like a fresh test rather than a memorized list. After every simulated exam you receive a score, and your errors are clearly marked, which makes it easy to see your weak and strong areas and build a focused study plan.
The real CTAL_TM_001 exam gives you 120 (150 for non-native language) minutes for 50 questions. The engine lets you rehearse under the same kind of time pressure, so pacing decisions become automatic.
ISTQB Official Registration: register for CTAL_TM_001
iSQI Registration: register for CTAL_TM_001
BCS Registration: register for CTAL_TM_001
ISTQB Accredited Training Providers: Visit official page
Official Syllabus and Sample Exams: Visit official page
To pass CTAL_TM_001 you need 58 out of 88 points (approx. 66%), and the official fee is USD 200 - USD 300 (varies by country/board). Setting the target score early makes it easier to measure your progress in practice tests.
Hold ISTQB Certified Tester Foundation Level certificate; recommended 18–36 months of practical testing experience
ISTQB Certified Tester Advanced Level - Test Manager Sample Questions:
You are monitoring the test results for the first week of system test execution to ensure they conform to the test plan objectives. You are guided by the list of test conditions and traceability matrix produced following test design. Test Plan objectives
* Approach - Risk-based and depth first
* Status reporting - Execution statuses must be either "Passed*, "Failed", "Blocked" or "Not Run"
* Traceability - Test execution results must be traceable back to the test conditions Test Conditions
Traceability matrix
Which one of the following is a correct statement regarding the current status of test plan objectives?
SELECT ONE OPTION
- A. All objectives have been met.
- B. None of the objectives have been met.
- C. Only Approach and Traceability objectives have been met.
- D. All the Traceability objective has been met.
Correct Answer: D 🗳️
During what step of the Fundamental Test Process should you define the methods to be used to collect test metrics?
- A. Closure
- B. Execution
- C. Planning
- D. Analysis
Correct Answer: C 🗳️
Explanation: Only visible for TestsDumps members. You can sign-up / login (it's free).
You are Test Manager of a project delivering a workflow system for complex business processes It has been decided a tool is required to increase the efficiency of test execution. What would be a valid issue to consider when deciding whether to build a custom made tool?
SELECT ONE OPTION
- A. The tool may be dependent on the person creating the tool if it is not adequately documented.
- B. The tool may only be useable for this project and have no long term benefits
- C. The tool may not meet the specific requirements for testing this project.
- D. It may not be possible to integrate the tool with existing tools used in the organisation.
Correct Answer: D 🗳️
You are the Test Manager for a software house (SoftTech), who provide a core banking product to retail banks around the world to enable their customers to process payments via the Internet and telephone banking.
Your current project is to integrate SoftTech's core banking product with Welsh Bank's existing bank systems.
However, Welsh Bank's systems are maintained by experienced developers and are poorly documented.
Welsh Bank has stated that this project must comply with Financial Conduct Authority (FCA) regulatory banking standards.
A specification for the 10 interfaces to Welsh Bank's existing systems has been produced by SoftTech's development team.
You have been asked to plan and conduct reviews for the system integration and support documentation of all the systems. Which of the following is the BEST approach for this project?
SELECT ONE OPTION
- A. Conduct a management review to assess progress of the integration features.
- B. Conduct an audit to verify that all test deliverables have been produced and signed off.
- C. Conduct Inspections to verify that all documentation conforms to a set standard.
- D. Conduct an informal review of the integration documentation before the systems are integrated.
Correct Answer: C 🗳️
Which of the following metrics would be most beneficial to collect to determine the effectiveness of a review process?
- A. The number of defects found in production for each module that was reviewed
- B. The business criticality of each module that was reviewed
- C. The development language used to create each module that was reviewed
- D. The elapsed time between each module's review and its corresponding deployment into production
Correct Answer: A 🗳️
Explanation: Only visible for TestsDumps members. You can sign-up / login (it's free).
Viewing page 1 out of 47 pages.
Viewing questions 1-5 out of 232 questions.








