Our IT experts check the update status of the SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing bank every day, and when a new version is ready it reaches your email immediately. That keeps you aware of the C-P2W22-2504 exam dynamic in real time.
SAP C-P2W22-2504 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C-P2W22-2504 |
| Related Certifications: | C_TS422_2504 |
| Passing Score: | 65–68% |
| Real Exam Qty: | 80–82 |
| Exam Duration: | 180 minutes |
| Available Languages: | English |
| Exam Format: | Multiple-choice (single answer), Multiple-response questions |
| Recommended Training: | SAP Learning Hub SAP S/4HANA Training Overview |
| Exam Registration: | SAP Training & Certification |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored via SAP Certification Hub |
| Pre Condition: | None officially required |
SAP C-P2W22-2504 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Lean Manufacturing | <=10% | - Repetitive manufacturing, Kanban, line loading |
| Topic 2: Introduction to SAP S/4HANA Production Planning | <=10% | - Production planning concepts and MRP vs consumption-based planning |
| Topic 3: Process Orders | <=10% | - Process manufacturing execution and control |
| Topic 4: Master Data | 11–20% | - Bill of materials (BOM), routing, production versions |
| Topic 5: Production Orders | 11–20% | - Order management, confirmations, and availability checks |
| Topic 6: Demand Management in SAP S/4HANA | <=10% | - Production strategies (make-to-order, make-to-stock, assembly planning) |
| Topic 7: Introduction to SAP S/4HANA Supply Chain Planning | <=10% | - SAP S/4HANA fundamentals and supply chain planning overview |
| Topic 8: Capacity Planning | <=10% | - Capacity evaluation and planning tables |
| Topic 9: Material Requirements Planning (MRP) | <=10% | - MRP run, lot sizing, planning strategies |
| Topic 10: Advanced Planning (PP/DS) | 11–20% | - Advanced planning tools and heuristics - Detailed scheduling and planning board usage |
Answers About SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Preparation
The real C-P2W22-2504 exam gives you 180 minutes minutes to answer 80–82 questions. Practicing under the same constraints on the TestsDumps engine makes the real pacing feel familiar.
Buying online raises fair concerns, so here are the facts: payment on TestsDumps runs through the Credit Card platform, one of the most widely used payment networks in the world, and we are committed to protecting your privacy. Our support team is also available to answer any doubt before you buy, so you can set aside your concerns and decide with confidence.
The package includes 82 practice questions for the C-P2W22-2504 exam. Candidates often note that the study thoughts behind them are concise and easy to absorb, which keeps revision efficient rather than tedious.
Feedback from buyers is one of the strongest reasons new candidates trust us. Reviewers frequently mention passing smoothly and scoring well, and many describe the study thoughts as concise, easy to get, and definitely not boring. We would rather let their words speak than write our own slogans.
SAP Training & Certification: register for C-P2W22-2504
None officially required
SAP Learning Hub: Visit official page
SAP S/4HANA Training Overview: Visit official page
- Advanced Planning (PP/DS) (11–20%)
- Material Requirements Planning (MRP) (<=10%)
- Master Data (11–20%)
Spend more time on the topics that carry the most weight.
SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Sample Questions:
What can you use standard heuristics in Advanced Planning (PP/DS) for?
- A. To automate material movements in material staging
- B. To solve planning problems for defined objects
- C. To set default values in production master data
- D. To optimize costs and times in production plans
Correct Answer: B 🗳️
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.
- A. Historical values
- B. Statistical procedures
- C. Forecasting
- D. Dependent requirements
- E. Planning file entries
Correct Answer: A,B,C 🗳️
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A. Validity period or sales order
- B. Alphanumeric or quota arrangement
- C. Lot size or material cost
- D. Planned order or material number
Correct Answer: B 🗳️
What is the focus of repetitive manufacturing?
- A. Detailed tracking of production orders
- B. Production of lot size one
- C. Low volume production
- D. Period and quantity-oriented production
Correct Answer: D 🗳️
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create in Kanban process
- C. Create without material
- D. Create by order release
Correct Answer: B,C 🗳️








