NEW QUESTION 46
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Implementation
  • B. Planning
  • C. Engineering change management
  • D. Inspection during production

Answer: A,B

 

NEW QUESTION 47
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When multiple operations are maintained for one product
  • C. When alternate resourcesare used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C

 

NEW QUESTION 48
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Move time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: A,D,E

 

NEW QUESTION 49
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements without checking the capacity of a work center.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: C

 

NEW QUESTION 50
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.

  • A. At order release
  • B. At order confirmation
  • C. At order creation
  • D. At order settlement

Answer: A,C

 

NEW QUESTION 51
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with automatic selection of production version.
  • C. Assign planned orders manual lying the planning table.
  • D. Run MRP with quotaarrangement.

Answer: A,D

 

NEW QUESTION 52
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Rate routing
  • D. Replenishment strategy

Answer: A

 

NEW QUESTION 53
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using lead the scheduling.
  • B. You canreschedule the order using material requirements planning.
  • C. You can reschedule the operation using finite Scheduling in a planning board.
  • D. You can reschedule the order using lead time scheduling.

Answer: C

 

NEW QUESTION 54
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To reduce the number of material masters
  • B. Tosimplify the structure of bills of material
  • C. To reduce the number of changes required in bills of material
  • D. To increase the number of planning levels
  • E. To make the assignment of components easier

Answer: B,C,E

 

NEW QUESTION 55
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific material group
  • B. Use a specific MRP type.
  • C. Use a specific material status.
  • D. Use a specific MRP controller.

Answer: B,D

 

NEW QUESTION 56
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Squeezing
  • B. Find Slot
  • C. Scheduling working time only
  • D. Insert operation

Answer: B

 

NEW QUESTION 57
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Sales order-specific planning run is required.
  • B. Sales order-specific stock is created
  • C. Production orders are created with sales order reference.
  • D. Storage location MRP areas are required.
  • E. Net requirements calculation is sales order-specific.

Answer: B,C,E

 

NEW QUESTION 58
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Minimum wait time
  • B. Production time
  • C. Goods receipt processing time
  • D. Queue time

Answer: D

 

NEW QUESTION 59
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Float after production
  • B. Setup time
  • C. Total replenishment lead time
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 60
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 61
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP controller
  • C. MRP group
  • D. MRP type

Answer: B

 

NEW QUESTION 62
When do you use variant bills of materials (BOMB)?

  • A. When multiple material also have the same BOM
  • B. When multiplematerial is have similar BOMB
  • C. When a material has a configurable BOM
  • D. When a material has multiple BOMB

Answer: A

 

NEW QUESTION 63
What is the difference between co-products and by-products?

  • A. Only co-products appear in the processor production order settlement rule.
  • B. Only co-products are identified by a special item category in the bill of material (BOM).
  • C. Only by-products have a zero inventory valuation.
  • D. Onlyco-products can be manufactured in isolation from the main product.

Answer: A

 

NEW QUESTION 64
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

Answer: C

 

NEW QUESTION 65
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the production version
  • B. In the production order type
  • C. In the MRP controller
  • D. In the routing
  • E. In the bill of materials (BOM)

Answer: B,C,D

 

NEW QUESTION 66
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with more than one work center
  • B. A production line with prioritized alternative work centers
  • C. A production line with an alternative sequence in the routing
  • D. A production line with a parallel sequence in the routing

Answer: A

 

NEW QUESTION 67
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Repetitive manufacturing profile
  • C. Routing
  • D. Production cost collector

Answer: A,C

 

NEW QUESTION 68
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Continuous flow materials
  • B. Co-products
  • C. Waste products
  • D. By-products
  • E. Bulk materials

Answer: B,C,D

 

NEW QUESTION 69
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers providing a cumulative available capacity for production
  • B. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • D. A group of work centers in a production line beingused in sequence for production

Answer: A

 

NEW QUESTION 70
......

SAP Exam Practice Test To Gain Brilliante Result: https://www.testsdumps.com/C_TS422_2020_real-exam-dumps.html

Tested Material Used To C_TS422_2020: https://drive.google.com/open?id=15kY1FKNtGexTzMPoZePL7TYxSTe5jq5q