NEW QUESTION 48
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Picking list
  • B. Transfer Order
  • C. Kanban
  • D. Backflushing

Answer: A

 

NEW QUESTION 49
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. In-house production time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 50
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To provide timely updates of inventory management for the staged components
  • C. To stage different components for a production line simultaneously
  • D. To reduce the totalproduction lead time for along production line

Answer: A,B

 

NEW QUESTION 51
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive planning horizon in the strategy profile.
  • B. Specify a negative planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: C

 

NEW QUESTION 52
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP Concur
  • B. SAP Ariba
  • C. SAP C/4HANA
  • D. SAP Field glass
  • E. SAP SuccessFactors

Answer: A,B,D

 

NEW QUESTION 53
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a production order.
  • B. It is converted into a planned order.
  • C. It is converted into a reservation.
  • D. It is converted into a schedule line.

Answer: C

 

NEW QUESTION 54
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Creation of a purchasing contract
  • B. Change of the storage bin
  • C. Creation of dependent requirements
  • D. Change of the material'sprocurement type
  • E. Creation of a sales order

Answer: C,D,E

 

NEW QUESTION 55
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By period
  • B. By material type
  • C. By industry
  • D. By plant

Answer: A,D

 

NEW QUESTION 56
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Controller
  • C. MRP Group
  • D. MRP Profile

Answer: C

 

NEW QUESTION 57
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with automatic selection of production version.
  • C. Assign planned orders manual lying the planning table.
  • D. Run MRP with quotaarrangement.

Answer: A,D

 

NEW QUESTION 58
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the phantom item indicator for the phantom assembly in the BOM.
  • B. Change the special procurement key of the phantom assembly in the BOM.
  • C. Change the item category of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D

 

NEW QUESTION 59
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 60
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers providing a cumulative available capacity for production
  • B. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • D. A group of work centers in a production line beingused in sequence for production

Answer: A

 

NEW QUESTION 61
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific material group
  • B. Use a specific MRP type.
  • C. Use a specific material status.
  • D. Use a specific MRP controller.

Answer: B,D

 

NEW QUESTION 62
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
  • C. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

Answer: B

 

NEW QUESTION 63
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Order-related
  • B. Milestone-related
  • C. Cost-related
  • D. Product-related

Answer: A,D

 

NEW QUESTION 64
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using lead the scheduling.
  • B. You canreschedule the order using material requirements planning.
  • C. You can reschedule the operation using finite Scheduling in a planning board.
  • D. You can reschedule the order using lead time scheduling.

Answer: C

 

NEW QUESTION 65
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.

  • A. The display template for material numbers applies to all clients.
  • B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • C. In Customizing you can decide by material type whether to use the long material number.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: A,B

 

NEW QUESTION 66
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When multiple operations are maintained for one product
  • C. When alternate resourcesare used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C

 

NEW QUESTION 67
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Operation network
  • C. Resource network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 68
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Indicator Relevant for finite scheduling must be set.
  • C. PRT Availability check must be set.
  • D. Checking rule and group must be assigned.

Answer: A,B

 

NEW QUESTION 69
......